Owner`s manual

BONAIRE DURANGO WINDOW COOLER
Installation
Water Connection
Fit mains water supply line to the float valve installed. The float valve connection is ½”
BSP.
Note: Water connection line to float valve must be flushed before connecting.
The overflow is factory fitted. The b
leed hose protruding through the overflow fitting
the quality of the Cooler and Cooling efficiency
y using standard 'over-the-
he float valve is factory set and should require no further adjustment at time of installation
ee page 13 if adjustment is required).
our cooler is now ready for commissioning.
ode and check the operation of the three speed fan.
of bleed off water
is coming from the overflow tube. This bleed off is designed to reduce mineral build up on
the CELdek
®
filter pads.
You may notice a wet paper smell as the water circulates around the filter pads. This is
normal during the commissioning phase and at the beginning of each season when the
unit is operated after the winter break. It will only last for a short time.
SHOULD bleed water during normal operation at a rate between 6 – 12 Litres per hour.
This is normal and is designed to preserve
of the Unit. If required this Bleed water can be plumbed awa
counter' garden hose and fittings.
T
(s
Y
Commissioning
Check that another door or window in the room is open to allow air to exhaust to other
parts of the house.
Turn the water supply to the cooler on.
Plug the cooler into a 240V 50Hz single phase grounded appliance socket on the inside of
the house and switch the socket on.
Turn the unit on to FAN m
Rotate the control knob to COOL mode and operate the three speed fan and pump.
Leaving the unit in the COOL mode, check that a constant small stream
Page 10
WEAC628