- Worcester, Bosch Group Gas Fired Boiler Instruction Manual

FLUE INSTALLATION
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior
8 716 107 336b (11/05)
25
INSTALLATION
A
B
C
D
E
A - Standard Flue
B - Internal Wall Seal
C - External Wall Seal
D - Clamp
E - Extension Duct
Flat at back
FLUE INSTALLATION
ASSEMBLING THE FLUE
1 Slide inner collar (B) onto terminal (A)
2 Additional extensions or bends:
Push fit all extensions/bends/terminal
together and secure connections with
clamps (D). The slope of the terminal outlet
must face downwards.
FITTING THE FLUE
3 Fit the terminal (A) through the flue opening
in the wall, exposing the plastic outlet
section to the outside and fit the outer
flue collar ( C ) over the notches to secure.
4 Assemble elbow to boiler using the three
screws (see below).
Note: Screws are in boiler not in flue kit.
FITTING THE ELBOW:
Flue elbow should push directly down and
not be twisted into correct position.
Remove the 3 inner flue tube retaining
screws. The inner tube will be held in place
in the appliance.
Fit turret onto appliance and retain with the
three removed screws.
NOTE: The clamping plate flat should be at
the rear of the appliance.
ADDITIONAL NOTES AND REMINDERS:
Ensure that all cut lengths are square and
free from burrs.
The flue, when assembled, is fully sealed and
components are pushed home.
The flue is set at an angle of 3° or 52mm per
1m length.
This screw should
be fitted last for
rear exit
This screw should
be fitted last for
easier installation
Apply silicone
grease to seal