Technical data

CONTROLS To comply with the Building Regulations, each section must have a tick in one or other of the boxes
TIME & TEMPERATURE CONTROL TO HEATING ROOM T/ST AT & PROGRAMMER/TIMER PROGRAMMABLE ROOMSTAT
TIME & TEMPERATURE CONTROL TO HOT W ATER CYLINDER T/ST AT & PROGRAMMER/TIMER
COMBI BOILER
HEATING ZONE VALVES FITTED NOT REQUIRED
HOT W ATER ZONE VALVES FITTED NOT REQUIRED
THERMOSTATIC RADIA TOR VALVES FITTED
AUT O M A TIC BYP ASS TO SYSTEM FITTED NOT REQUIRED
FOR ALL BOILERS CONFIRM THE FOLLOWING
THE SYSTEM HAS BEEN FLUSHED IN ACCORDANCE WITH THE BOILER MANUFACTURERS INSTRUCTIONS?
THE SYSTEM CLEANER USED
THE INHIBIT OR USED
FOR THE CENTRAL HEATING MODE, MEASURE & RECORD
GAS RATE ft
3
/hr
BURNER OPERATING PRESSURE (IF APPLICABLE) mbar
CENTRAL HEATING FLOW TEMPER ATURE ¡C
CENTRAL HEATING RETURN TEMPERATURE ¡C
FOR COMBINATION BOILERS ONLY
HAS A W ATER SCALE REDUCER BEEN FITTED? YES NO
W H AT TYPE OF SCALE REDUCER HAS BEEN FITTED?
FOR THE DOMESTIC HOT WATER MODE, MEASURE & RECORD
GAS RATE ft
3
/hr
MAXIMUM BURNER OPERATING PRESSURE (IF APPLICABLE) mbar
COLD WATER INLET T E MPERATURE ¡C
HOT W ATER OUTLET TEMPERATURE ¡C
W ATER FLOW RATE
lts/min
FOR CONDENSING BOILERS ONLY CONFIRM THE FOLLOWING
THE CONDENSATE DRAIN HAS BEEN INSTALLED IN ACCORDANCE WITH
THE MANUFACTURERS INSTRUCTIONS? YES
FOR ALL INST ALLATIONS CONFIRM THE FOLLOWING
THE HEATING AND HOT W ATER SYSTEM COMPLIES
WITH CURRENT BUILDING REGULATIONS
THE APPLIANCE AND ASSOCIATED EQUIPMENT HAS BEEN INSTALLED AND COMMISSIONED
IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS
IF REQUIRED BY THE MANUFACTURER, HAVE YOU RECORDED A CO/CO
2 RATIO READING? N/A YES CO/CO2 RATIO
THE OPERATION OF THE APPLIANCE AND SYSTEM
CONTROLS HAVE BEEN DEMONSTRATED TO THE CUSTOMER
THE MANUFACTURERS LITERATURE HAS BEEN LEFT WITH THE CUSTOMER
m
3
/hr
m
3
/hr
COMMISSIONING ENGS NAME PRINT CORGI ID No.
SIGN DATE
BOILER SERIAL No. NOTIFICATION No.
BENCHMARK No.
GAS BOILER COMMISSIONING CHECKLIST
COLLECTIVE MARK
N/A
N/A