Operation Manual

Table Of Contents
5. Locate the Brown and Grey wires from the composite cable.
6. Connect the heater wires Brown and Grey to terminal block HD6 as labelled on the PCB.
The heaters are thermostatically controlled and will automatically turn on at +5 °C (+41
°F) and turn off at +15 °C (+59 °F).
7. Check all connections.
8. Close the PSU enclosure.
9. Reconnect the power supply to the power source.
Simultaneous IP and Analog Video/Control ("Hybrid"
Operation)
The figure below illustrates how to configure your system to achieve simultaneous video and
control over both IP and analog connections.
Figure 5.13: System configuration for simultaneous video/control
Number
Description
1 Connection between MIC camera and BNC T-connector in BNC socket on PCB in
MIC IP PSU
2 Connection between BNC T-connector and encoder in MIC IP PSU
3 Connection between BNC T-connector and Bilinx-based control (head-end) system
4 Connection between Bilinx-based control (head-end) system and Local Area
Network (LAN) (or the "cloud")
5 Connection between the Local Area Network (LAN) and PC connected to video
monitor
5.11
30 en | Install the MIC (standard) PSU MIC612 Thermal Camera
2016.03 | 2.2 | F.01U.249.416 Operation Manual Bosch Security Systems