Replacement Part List

NOTE: Due to the weight / size of the two assemblies, its recommended two or more adults to assist lifting and moving
them. Lifting tools such as hoist, crane, jack, etc. are also recommended.
Step 6: Inspect if all component assemblies, parts and accessories are included as listed in the Packing List (Page 27).
If any parts are damaged or missing, please call our customer service department at 1-800-780-2677 or send an email to
service@boss-industrial.com for assistance.
Assembling tools needed:
1. Wrench 13, 14mm two each 5. Needle nose pliers x 1
2. Wrench 16, 17, 27, 30mm one each 6. Flat head screwdriver x 1
3. Adjustable wrench x 1 7. Cross head screwdriver x 1
4. Thread locking compound x 1
STEP 1: Install the tongue and jack stand assembly. See FIGURE 5.
1. Pull out the spring loaded lock handle of flip-down stand which hold the stand on the tongue, and then the stand
automatically flip down towards the ground and be secured in position.
2. Remove the M10 hardware from the beam support bracket on the tank using a 16mm wrench for bolts and a 17mm
wrench for the lock nuts. Attach the tongue to the reservoir assembly and screw on the hardware just removed and
tighten.
.
REF. NO. DECSRIPTION QTY.
1
Reservoir tank assembly
1
2
Tongue & Flip-down stand assembly
1
3
M10 Hardware on beam support bracket, including:
1
3-1
Hex head bolt / M10 x 75
2
3-2
Flat washer / M10
4
3-3
Lock nut / M10
2
ASSEMBLING
(FIGURE 5)
7