User guide

12. Fit the vertical flue offtake plate to the rear top panel of the boiler and fit the assembly into position over
the vertical offtake spigot.
13. Take one of the 500mm vertical extensions or 1000mm, fit an O Ring Seal to the outer duct, and ensure
that the flue exhaust seal is fitted to the inner ducts undamaged and in the correct orientation. Lubricate all
seals with a mild detergent.
14. With the seals fitted slide the extension in to the offtake socket external O Ring end first.
15. Repeat steps 13 & 14 above for next section. Slide ceiling trim over the next section before engagement.
Fix the ceiling trim in position.
16. Using the drill provided drill 6 holes to secure sections to adjacent ones and secure with the self tapping
screws supplied.
17. Fit flashing plate and cravat. Seal joint between Cravat and Flue with a suitable weatherproof sealant.
Keep Cravat as low as possible onto flashing plate to prevent entry of animals, birds or insects.
18. Inside:
Using the clips supplied fix the air duct to the burner spigot and vertical flue offtake spigot.
Continue with the rest of the installation.
BOULTER BUDERUS CAMRAY 5
PAGE 34
Pa
g
e 49 of 67
14/04/2005file://D:\PL47000\PL47000.htm