User guide

1:2 IMPORTANT SAFETY NOTES
To obtain the best possible performance and trouble free operation from your Boiler, it is important that you
read these instructions carefully. Your Camray Boiler has built-in safety features, which are detailed in the
relevant section of this manual.
1:2.1
The heating system must comply with the latest editions of British Standard 5410 and The Building
Regulations.
Please note: It is essential in the interest of the Boiler efficiency and reliable performance that once
the Boiler has been installed it is first commissioned by a competent and preferably an O.F.T.E.C.*
registered engineer. It is the responsibility of the installer to ensure that the Boiler is commissioned.
If an engineer is not known, Boulter Buderus will be pleased to provide details of commissioning and
servicing engineers from their register.
*The Oil Firing Technical Association for the Petroleum Industry - Banstead, Surrey 01737 373311.
z If it is known or suspected that a fault exists on the Boiler, it MUST NOT be used until the fault has
been corrected by a competent engineer (see Failure to Start).
z It is essential that the instructions in this booklet are strictly followed for safe and economic operation of
the Boiler. Failure to observe these instructions may invalidate your right to free breakdown cover
during the guarantee period.
We recommend that you keep these instructions in a place near your appliance for easy reference.
1:2.2 Air Supply to Boiler - Conventional Flue
Where your Boiler is used on an open conventional flue system, a permanent air supply is required for
combustion. Clearances provided at the sides and rear of the appliance for air entry must be kept free of
obstruction. For further explanation please refer to section 4.6 of this installation manual.
Your Camray Boiler should be connected to an electrical supply complying with the Electrical Wiring
Regulations (BS7671): as well as an oil supply complying with BS5410 Pt.1; and an appropriate flue system.
z ALWAYS SWITCH OFF THE ELECTRICAL SUPPLY before removing any of the covers for cleaning.
BOULTER BUDERUS CAMRAY 5
PAGE 2
If any part of the Boiler or its flue is modified, then the guarantee/warranty will be invalidated.
1:3 INSTALLATION & COMMISSIONING
A
fte
r
your Camray Boiler has been installed it MUST be commissioned by a competent engineer preferably an
O.F.T.E.C. registered engineer, or by one of our registered service engineers. Commissioning involves testing
the Boiler to ensure that it is working correctly, and also setting the Burner correctly to ensure the most
efficient operation and use of fuel. If the Boiler has not been commissioned, it may not be operating at the
maximum efficiency possible for your heating system, and may also invalidate the guarantee.
Oil Tank Capacity
Litres
Oil Supplier 1
Oil Supplier 2
Pa
g
e 6 of 67
14/04/2005file://D:\PL47000\PL47000.htm