User guide

Adjust the air shutter if necessary, open to reduce CO
2
, close to increase CO
2
.
If the air shutter is adjusted, re-check the Smoke No.
Check the flue gas temperature.
The figures should agree with the Boiler Commissioning Data.
Check lockout function, either cover the photocell or remove solenoid coil, to simulate flame failure.
Reinstate components and press lockout button.
Check the operation of the limit thermostat
Complete commissioning report and enter the details on to the guarantee form which should be returned
to BOULTER BOILERS in the envelope provided.
Instruct the user on the operation of the appliance and leave this manual with the customer.
BOULTER BUDERUS CAMRAY 5 PAGE 43
8:1 MAINTENANCE
A
boiler fired with Class C Oil should only require attentions once each year.
8:1.1 General Inspection
With the Boiler operating, inspect for signs of unsatisfactory operation, i.e. leakage of combustion products,
leakage of oil, or unusual noises from the pump or motor.
Check the commissioning list if it is your attendance to the appliance. Is there a reason why the Boiler might
fail after you leave?
It is useful to measure the combustion date, i.e. CO2, Smoke No. and flue gas temperature, and a check on
the oil pressure, prior to carrying out maintenance work.
8:1.2 Maintenance Procedure
Switch off electrical supply at the MAINS ISOLATING SWITCH.
OIL TANK
De-sludge oil tank (if necessary), and draw of any accumulated water.
Check the correct grade of oil is being used.
FILTERS
Inspect and clean all oil filters. Change paper elements for new.
BURNER
Turn off the oil cock and disconnect the flexible oil hose from the oil cock.
Pa
g
e 60 of 67
14/04/2005file://D:\PL47000\PL47000.htm