Operation Manual
Fasteners (fig. C)
10 Carriage bolt (M8*55)
22 Screw (M5*12)
11 Washer (D8*19)
23 Washer (D6*16)
12 Locknut (M8)
24 Hex bolt (M8*20)
13 Allen bolt (M8*16)
25 Washer (D17.5*25)
14 Spring washer (D8.1*12.9)
26 Curved washer (D17.5*25)
16 Curved washer (D8*19)
27 Teflon washer (D10*25)
17 Cross-head screw (M5*12)
28 Allen bolt (M8*55)
18 Screw (M4*12)
29 Washer (D8*16)
19 Washer (D8*25)
30 Locknut (M8)
20 Spring washer (D8*14)
31 Screw (M8*12)
21 End cap
32 Cross-head screw (M5*14)
Assembly (fig. D)
WARNING
– Assemble the equipment in the given order.
– Carry and move the equipment with at least two persons.
CAUTION
– Place the equipment on a firm, level surface.
–
Place the equipment on a protective base to prevent damage to the
floor surface.
–
Allow at least 100 cm of clearance around the equipment.
▪ Refer to the illustrations for the correct assembly of the equipment.
EN
CR7 15