Use and Care Manual

7
9. DUCT CONNECTION
VERTICALLY DUCTED INSTALLATION:
Slide a 6” round metal duct section over the adapter/damper on the hood up to the roof
cap. Use metal foil duct tape to seal the joint.
HORIZONTALLY DUCTED INSTALLATION:
Measure and install 6” round metal ductwork to wall cap and 90° elbow over duct collar
then install the 90° elbow over the adapter/damper on the hood. Use metal foil duct tape
to seal the joints.
NON-DUCTED INSTALLATION:
Remove the damper flaps. Measure the length of 6” round flexible duct (included in the non-
duct kit) required from the top of the hood to the plenum. Slide the 6” round flexible metal
duct over the adapter on the hood. Use metal foil duct tape to seal the joint.