Install Instructions

16
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 2012/10
We reserve the right to make any changes due to technical modifications.
Boiler block assembly7
7.1 Assembly when delivered in sections
z Assemble all boiler sections in accordance with the
following instructions and diagrams.
7.1.1 Preparing boiler sections
z Position the rear section onto two wood blocks.
z Clean the boiler hubs with sandpaper and a rag.
z Remove any burrs with a file.
z Clean the packing spring or packing groove with a
wire brush and rag.
z Clean the hub sealing faces with a rag soaked in
cleaning agent.
z Evenly coat the boiler hub sealing faces with red lead
putty.
z Coat the packing spring or packing groove with
adhesive (adhesive base).
Fig. 5 Remove burrs
1 Boiler hubs
2 Back section
3 Wood blocks
4 Sealing spring
3
1
2
1
4
CAUTION!
RISK TO HEALTH and
DANGER OF BURNS
due to released vapors and easily
flammable cleaning agents.
z When using red lead putty, adhesives
and solvents ensure adequate
ventilation inside the installation room.
z When using solvents, avoid open
flames, incandescence and sparks.
z Please observe the manufacturer's
handling and safety instructions.
Fig. 6 Coat boiler hubs with red lead putty
1 Boiler hub sealing face
2 Sealing spring
1
1
2