Install Instructions

18
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 2012/10
We reserve the right to make any changes due to technical modifications.
Boiler block assembly7
7.1.4 Inserting the section sealing
z Unroll the required length of section sealing from the
roll supplied.
z Peel the backing paper from the sealing rope as you
insert the cord into the packing groove.
z Insert the flexible sealing rope into the packing
groove starting in the upper boiler hub area, and
lightly press in.
z Overlap sealing rope 3/4" at the joins and press in
well.
7.1.5 Knock intermediate section into place
z Turn the intermediate section around and locate with
the upper and lower boiler hubs on the nipples of the
rear section.
z Drive the intermediate section onto the rear section
using a wood or a rubber mallet.
Fig. 9 Inserting the section sealing rope
CAUTION!
SYSTEM DAMAGE
due to leaking boiler sections.
z To ensure that the faces between the
boiler sections are sealed correctly
never stretch the sealing rope during
application.
z Carefully insert the sealing rope into the
boiler section packing grooves.
Fig. 10 Knock intermediate section into place
1 Wood or rubber mallet
2 Rear section
1
2