Install Instructions

26
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 2012/10
We reserve the right to make any changes due to technical modifications.
Boiler block assembly7
7.3 Installation when boiler is supplied assembled
A leak test of the boiler block is carried out at the factory
when the boiler is supplied assembled.
z Cut through the straps.
z Remove the pallet prior to positioning the boiler
block.
7.4 Installation steps for disassembled and assembled delivery
Carry out the steps detailed in this chapter for deliveries
in sections or as block. Where there are different
procedures for installation between disassembled and
assembled delivery, this is noted in the manual.
7.4.1 Fitting adjustable feet
Use the adjustable feet (packaging Î components
page 12) to adjust the boiler to a horizontal position to
prevent air from collecting in the boiler.
z Tip the boiler or support it on a wood block.
z Screw in adjustable feet 0.20 - 0.40 inches.
z Gently set the boiler down.
Fig. 27 Boiler block on pallet (as delivered)
1 Securing straps
1
WARNING!
DANGER TO LIFE
from falling material.
z Ensure that a suitable means of
supporting the load is available.
z Observe all locally applicable
Occupational Health & Safety
regulations regarding lifting equipment.
Fig. 28 Fitting adjustable feet