Install Instructions

38
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 2012/10
We reserve the right to make any changes due to technical modifications.
Boiler installation8
z Screw studs included with the B-Kit to the burner
door.
z Fit the burner to the hole circle of the burner door.
z Install burner with the correct nozzle and settings
(air, pump pressure, turbulator settings, flange
position).
z Place the seal on the studs and secure the burner
with the included nuts.
z Follow the manufacturer's direction for installation,
fine adjustment and regular maintenance
procedures.
z Wire up the burner (see Î documentation for
burner).
8.5 Providing a fuel supply
Make the fuel connection in accordance with all locally
applicable regulations. We recommend the installation
of a fuel filter.
z Visually inspect the fuel pipe and clean or replace, if
necessary.
z Install a shut-off valve into the fuel supply pipe.
z Connect the fuel pipe free of stress to the boiler.
z Check the fuel line for leaks.
8.6 Aquasmart installation
An Aquasmart controls the boiler supply temperature.
z Install Aquasmart and sensor well as specified by the
installation manual.
For operating the boiler with Aquasmart control see
instructions supplied with the controller.
Fig. 51 Burner door mounting holes
4 3/8"
5 7/8"
NOTICE
Approved burners with accessories (such
as aquastat and circulator) are also
available as a package from Buderus
Hydronic Systems.
NOTICE
For the correct burner settings see the
Î documentation for the flue system and
the Î burner.