Cultivator Operator's And Parts Manual

Cultivator
7
OPERATION
THEORY OF OPERATION
REVERSIBLE POINT REPLACEMENT OR REVERSAL:
1. Raise the Cultivator off the ground.
2. Securely block up the frame
3. Remove the Plow Bolts as required.
4. If the top side of the reversible point has not been used, reverse and reattach.
If it has been used, replace reversible point.
5. Install plow bolts and re-tighten.
6. Replace points if the tips are badly worn. The plow bolts should also be
replaced if the heads become badly worn.