Service Manual

23
SOFTHEAT POWER
FIG. 23-1 SOFTHEAT CONTACTS
Location:
The SoftHeat contacts are located on the lower
front of the trunk.
Test Procedure:
1. Check circuit breaker, reset if tripped.
2. Remove server(s).
3. Set meter to DC 24 volts scale. Check for 24VDC
between the right (+) and left (-) terminals. Fig.
23-1.
If voltage is not present as described, continue to # 4.
4. Remove front panel . Verify LED is illuminated.
Fig. 23-2 & 3.
5. If illuminated, Check output of power supply for
24VDC. If not illuminated, Set meter to AC 208-240
volts scale (depending on the incoming line volt-
age). Place the meter probes on the power supply
"Line in" terminals. Voltage should read about the
same as line voltage across main terminal block.
Removal and Replacement:
1. Disconnect the brewer from the power source.
2. Disconnect the wires from the power supply.
3. On the Twin, remove two screws securing power
supply to base. On the single, remove two screws
securing component mounting bracket to base,
then remove four screws securing power supply
to component mounting bracket. NOTE: When
installing new power supply, verify the voltage
selector switch is set to the proper voltage.
L2 or
NEUTRAL
L1
FIG. 23-2 SH POWER SUPPLY
54299 030718
FIG. 23-3 TEST OUPUTS
+
24V
-
24V
POWER
LED