Product Manual

SEWAGE PUMP APPLICATION:
STEP 7
Install check valve.
STEP 6
Set gaz tight cover,
discharge and vent
pipes.
STEP 2
Install sewage
basin.
STEP 4
Drill a 1/4’ hole.
STEP 3
Cement 2’ adaptor
to pipe.
STEP 8
Connect to
receptacle.
STEP 10
Secure cover
and make vent
connection.
STEP 5
Install discharge
pipe and lower
pump in centre
of basin.
STEP 9
Fill with water and
test operation.
# REF. DESCRIPTION
1 311130 Motor Cover
2 311131 Suction Cover
3 311145 Motor
4 311132 Pump Body
5 311133 Impeller
6 311134 Base support
7 311135 Capacitor
8 311136 Cutter
9 311137 Cutter ring
10 311138 Mech. Seal
11 311139 Oil Seal
12 311140 O-Ring (Top Cover)
13 311141 Packing (Flange)
# REF. DESCRIPTION
14 311142 Flange
15 311143 Handle
16 311144 Cable
13
15
6
8
9
1
11
14
2
3
5
10
12
4
16
11
7
5
Repair parts may be ordered from your authorized point of sale or from BUR-CAM PUMPS
REPAIR PARTS: