User Manual

8644/Rockwell - 13
INSTALLATION / COMMISSIONING
bar
Switch on the pressure supply.
Only then switch on the voltage!
Fluidic commissioning
Check the connections, voltage and operating pressure!
Make sure that the max. operating data (see rating plate) are not exceeded!
Check allocation according to instructions of ports 1 and 3 or 5: these shall under no circumstances be
swapped!
For electrical operation, unlock the manual override!
Measures to be taken before fluidic initialization
Fluidic commissioning
All the necessary steps for this should be taken from the Rockwell Operating Instructions Chapter 2 „Wiring
the Adapter“.
All the necessary steps for this should be taken from the Rockwell Operating Instructions Chapter 3 „How
to Configure Point I/O Modules“.
Elektrical installation
Electrical commissioning