Alpine Installation, Operating, and Service Instructions

132 103448-02 - 6/13
Appendix A - Figures (continued)
Figure
Number
Page
Number
Description
Section IV - Venting (continued)
Figure 30 45 Cutting Vertical Terminal
Figure 31 45 Completing Vertical Terminal Installation
Figure 32 46 Chimney Chase Installation
Figure 33 47 Multiple Boiler Direct Vent Termination
Figure 34 49 Multiple Boiler Concentric Vent Termination
Section V - Condensate Disposal
Figure 35 51 Condensate Trap and Drain Line
Section VI - Water Piping and Trim
Figure 36 52 Factory Supplied Piping & Trim Installation
Figure 37 57 Near Boiler Piping - Heating Only (with Central Heating Circulators)
Figure 38 58 Near Boiler Piping - Heating Plus Indirect Water Heater
Figure 39 60 Isolation of the Boiler From Oxygenated Water with A Plate Heat Exchanger
Figure 40A 61 Multiple Boiler Water Piping w/Domestic Hot Water Heater (Page 1 of 2)
Figure 40B 62 Multiple Boiler Water Piping w/Domestic Hot Water Heater (Page 2 of 2)
Figure 41A 63 Alternate Multiple Boiler Water Piping w/ Indirect Domestic Hot Water Heater (Page 1 of 2)
Figure 41B 64 Alternate Multiple Boiler Water Piping w/Indirect Domestic Hot Water Heater (Page 2 of 2)
Section VII - Gas Piping
Figure 42 69 Recommended Gas Piping
Section VIII - Electrical
Figure 43 72 & 73 Wiring Connections Diagram
Figure 44 75 Ladder Diagram
Figure 45A 76
Modied Wiring For DHW Priority When Using Low Flow Circulator Piped Off System Header -
Heating (with Central Heating Circulators) Plus Alternately Piped Indirect Water Heater
Figure 45B 77
Modied Wiring For DHW Priority When Using Low Flow Circulator Piped Off System Header -
Heating (with Central Heating Zone Valves) Plus Alternately Piped Indirect Water Heater
Figure 46 78
Three Boiler Modular Wiring Diagram, Internal Sage2.1 Multiple Boiler Control Sequencer (Three
Boilers Shown, Typical Connections for up to Eight Boilers)
Figure 47A 79 Multiple Boiler Wiring Diagram w/Tekmar 265 Control
Figure 47B 80 Multiple Boiler Wiring Diagram w/Tekmar 264 Control
Figure 48 81 Recommended “Immersion” Type Header Sensor Installation Detail
Figure 49 81 Alternate “Strap-on” type Header Sensor Installation Detail
Figure 50 81 RJ45 Splitter Installation Detail
Section IX - System Start-Up
Figure 51 84 Lighting Instructions
Figure 52 85 Burner Flame
Figure 53 88 Dungs Gas Valve Detail