Alpine Installation, Operating, and Service Instructions

103448-02 - 6/13 23
Table 5A: CPVC/PVC Vent & Air Intake Components Included With Boiler
Vent & Air Intake Components
Part
Number
Quantity
ALP080B & ALP105B
Standard Termination
Vent Kit
(P/N 102189-01)
includes
ALP150B & ALP210B
Standard Termination
Vent Kit
(P/N 102189-02)
includes
ALP285B thru
ALP399 Standard
Termination Vent Kit
(P/N 102189-03)
includes
3” Schedule 40 PVC Tee (Vent & Air Intake
Terminals)
102190-01 2 1 N/A
4” Schedule 40 PVC Tee (Vent & Air Intake
Terminals)
102190-02 N/A 1 2
3” Stainless Steel Rodent Screen 102191-01 2 1 N/A
4” Stainless Steel Rodent Screen 102191-02 N/A 1 2
3” x 30” Schedule 40 CPVC Pipe 102193-01 1 1 N/A
4” x 30” Schedule 40 CPVC Pipe 102193-02 N/A N/A 1
3” Schedule 80 CPVC 90° Elbow 102192-01 1 1 1
4” Schedule 80 CPVC 90° Elbow 102192-02 N/A N/A 1
4 oz. Bottle of Transition Cement 102195-01 1 1 1
4 oz. Bottle of Primer 102194-01 1 1 1
3" Vent/3" Combustion Air CPVC/PVC
Connector
102183-01 1 N/A N/A
3" Vent/4" Combustion Air CPVC/PVC
Connector
102183-02 N/A 1 N/A
4" Vent/4" Combustion Air CPVC/PVC
Connector
102183-03 N/A N/A 1
3" Vent/3" Combustion Air CPVC/PVC
Connector Gasket
102185-01 1 N/A N/A
4" Vent/4" Combustion Air CPVC/PVC
Connector Gasket
102185-02 N/A 1 1
d. Follow all manufacturer instructions and
warnings when preparing pipe ends for joining
and using the primer and the cement.
3. Field Installation of CPVC/PVC Two-Pipe
Vent System Connector - Floor Mounted
Boiler Builds
Refer to Figure 6 and Steps below:
a. Position the CPVC/PVC vent connector and
gasket onto boiler rear/bottom panel and insert
vent connector inner stainless steel vent pipe into
heat exchanger vent outlet.
IV. Venting B. CPVC/PVC Venting (continued)
b. Align vent connector plate and gasket clearance
holes with rear/bottom panel engagement holes;
than, secure the connector and gasket to the
panel with six mounting screws.
c. Apply supplied dielectric grease (grease pouch
attached to two-pipe vent connector) to gasket
inside vent section of two-pipe vent connector,
The grease will prevent gasket rupture when
inserting vent pipe and gasket deterioration due
to condensate exposure.
Vent Components
Part
Number
Quantity
ALP080B &
ALP105B
Horizontal (Snorkel)
Termination
ALP150B &
ALP210B
Horizontal (Snorkel)
Termination
ALP285B thru
ALP399
Horizontal (Snorkel)
Termination
3" Schedule 40 PVC Pipe x up to 7 ft. max. vertical run
N/A
Supplied
by
Others
2 1 N/A
4" Schedule 40 PVC Pipe x up to 7 ft. max. vertical run N/A 1 2
3" Schedule 40 PVC 90° Elbow 4 2 N/A
4" Schedule 40 PVC 90° Elbow N/A 2 4
3" Schedule 40 PVC Pipe x ½ ft. min. horizontal run 2 1 N/A
4" Schedule 40 PVC Pipe x ½ ft. min. horizontal run N/A 1 2
Table 5B: CPVC/PVC Vent & Air Intake Components (Installer Provided) required for Optional Horizontal
(Snorkel) Termination