MPO-IQ Installation, Operating, and Service Instructions

19
Figure 9: Oil Burner Installation (Beckett shown)
7. Install oil burner. (See Figure 9)
Step a. Open burner carton and remove contents.
Step b. Place oil burner gasket on burner and align
holes.
CAUTION
Do not install burner without gasket.
Step c. Remove three (3) 5/16-18 x 3/4 lg. cap screw from
burner swing door used for mounting burner.
Step d. Thread (1) 5/16-18 x 3/4 lg. cap screw,
approximately three (3) full turns, into tapping
located at 12:00 o'clock on burner swing door.
II. PACKAGED BOILER ASSEMBLY - TRIM & CONTROLS (cont'd)
Step e. Insert oil burner into the opening of burner swing
door. Align and engage keyhole slot in burner ange
over head of protruding cap screw installed in previous
Step. Rotate burner to the right to lock ange behind
head of cap screw.
Step f. Align holes and install two (2) remaining cap
screws. Level burner and fully tighten all three (3)
screws.
Step g. Plug burner power cord into power outlet receptacle
located in lower right corner of front panel.
Step h. Check oil nozzle in burner for size, angle and
spray type; inspect electrode settings and head/air
plate setting. Refer to Tables 16A thru 16C, 17 and
Section IX. Refer to Burner Manufacturer's Manual
for detail instructions.