Gas-Fired Hot Water Boiler Installation & Operation Manual

5
Table 4.2: Clearances From Vent Piping To Combustible Construction
TYPE OF VENT PIPE PIPE DIRECTION ENCLOSURE
MINIMUM CLEARANCE
TO COMBUSTIBLE
MATERIAL
BURNHAM AL29-4C

HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
FLEX-L STAR-34
VERTICAL OR
HORIZONTAL
AT LEAST ONE SIDE OPEN,
COMBUSTIBLE MATERIAL ON A
MAXIMUM OF THREE SIDES
1”
HORIZONTAL OR VERTICAL
WITH OFFSETS
ENCLOSED ON ALL FOUR SIDES
2-1/2”
VERTICAL WITH NO OFFSETS
Figure 4.1: Clearances To Combustible Or Non-combustible Material