Owner`s manual

The drilling of holes in the ceiling must be done by the professional personnel.
Installation stands for main body of the
unit
Ceiling
Above
20
Fig 1
Notes: The dimension for the ceiling openings with * marks can be as large as 910mm. But the
overlapping sections of the ceiling and the decorated surface boards should be maintained at no
less than 20mm.
E. Main body of hoisting air conditioner
Nut (supplied at
scene)
Gasket
(attachment)
Insert
Hoisting
stand
Tighten (double
nuts)
Gasket anchor
board
(attachment)
[Fix the hoisting stand
firmly
]
[Fix the gasket
firmly
]
Center of the
ceiling
opening
Install
cardboard
Water
lever
Bolt
attachment
Polyethylene
pipe
Bolt
attachment
[Fix the install
cardboard
]
Fig.2
1. The primary step for install the indoor unit.
When attach the hoisting stand on hoisting screw, do use nut and gasket individually at the upper and
lower of the hoisting stand to fix it. The use of gasket anchor board can prevent gasket break off.
2. Use install cardboard
(160)
Bolt of one of the angle
o
on the angle of the
drain
f
outlet
age
slot
pipe is
fix