Owner`s manual

Note: 1. The standard pipe length is 5m,When the length(L) of the connecting pipe is less than or
equals 5m,there is no need to add refrigerant. If the connecting pipe is longer than 5m,it is
required to add refrigerant, in the above table, the amounts of refrigerant to be added for the
models are listed for each additional meter of pipe length.
2. The pipe wall thickness shall be 0.5-1.0mm and the pipe wall shall be able to withstand the
pressure of 6.0MPa.
3. The longer the connecting pipe, the lower the cooling effect and the heating effect.
Smear freeze
motoroil
here
Median sponge
(attachment)
(entwine the wiring
interface
with seal
mat)
Thread fasten(x4)
Torque
wrench
Heat
preservation
sheath of liquid
inlet
tube (attachment)
(for
liquid
tube)
Heat
preservation
sheath of gas
collection
tube
(attachment)(for
gas
tube)
Spanner
Gas collection
tube
Liquid inlet
tube
Wiring
interface
Fig.3
Flare
nut
When connect the pipe to the unit or back out it from the unit, please do use both spanner and
torque wrench. as shown in fig.3.
When connect, smear both inside and outside of the flare nut with freeze motor oil, screw it by
hand and then tighten it with spanner.
Refer to form 1 to check if the wrench had been tightened (too tight would mangle the nut and
lead leakage).
Form 1: The tightening torque needed for tightening nut
Examine the connection pipe to see if it had gas leakage, then take the treatment of heat insulation,
as shown in the fig.3.
DiameterInch
Surface thicknessmm
Tightening torque (N.m)
φ
1/4
0.5
15-30 (N·m)
φ
3/8
0.71
30-40 (N·m)
φ
1/2
1
45-50 (N·m)
φ
5/8
1
60-65 (N·m)
φ
3/4
1
70-75 (N·m)