Switch User Manual

1-7
Installing the 9Cx14 Chassis
Rack Mounting the Chassis
The chassis can be mounted in a standard 19-inch equipment rack. If the rack is
not secured to the floor, it is recommended that the SmartSwitch 9000 be installed
in the bottom half of the rack. This will prevent the rack from being top heavy.
Two people may be required to lift the chassis into place.
The chassis is secured with twelve bolts, six on each side. Using the bolts
provided with the rack, bolt the chassis to the rack, starting with the bottom holes
and working up, as shown in Figure 1-2.
Figure 1-2. Rack Mounting the Chassis
1125_05