Installation Guide

COL
HOT
ON
60 sec
crack or break the copper mounting post.
complete tightening. Do not overtighten, which can
wrench to give the lock nut no more than a ¼ turn to
Hand tighten, then use an adjustable Important:
tightening.
sealant or plumber’s tape to the threads before
labels on the supply posts. Apply a bit of thread
connecting the hot and cold in accordance with the
supply posts on the faucet. Ensure that you are
6. Attach your main water lines to the copper water
weight together and tighten the screws to secure.
mounted at this location. Clamp the two sides of the
from the faucet body. The weight will need to be
From beneath the counter, measure 15” down the hose
by removing the two screws with a Phillip’s screwdriver.
5. Disassemble the provided hand sprayer hose weight
check for any leaks.
allow the sprayer to run for another 60 seconds, and
running properly. Turn on the hand sprayer function and
leaks. Check to ensure that both hot and cold water are
8. Turn the faucet on and ensure that there are no
any leaks underneath.
supply back on from underneath your sink. Check for
7. Once installation is complete, turn the main water
Kitchen Faucet Installation Instructions
KITCHEN FAUCET INSTALLATION