Installation Sheet

9516_ii_140613 Pg 2
3
4
INSTALLING IN WOOD FLOOR
Determine location of tub & faucet prior to
proceeding
Important: It is the responsibility of the INSTALLER to ensure
that the floor rough is properly secured to all sub-floor construction.
All local building and plumbing codes and/or ordinances, shall be
followed to confirm proper secure installation.
After determining tub location preparing the floor is
necessary to properly support the rough PLATE❻
by using 2 x 4 wood cross SUPPORT which are
attached floor JOIST
Important: It is the responsibility of the INSTALLER to have
some knowledge of finished floor thickness before proceeding.
Place MUDGUARDS onto NIPPLES
Use a LEVEL to properly level the PLATE and
SUPPORTS in all directions; vertical height of
PLATE is determined by using the MIN/MAX
finished floor marks on MUDGUARD
Verify that copper PIPES attached to bottom of
NIPPLES clear SUPPORT; adjust in necessary
Using SCREWS secure the PLATE to both
SUPPORTS❼andattach to floor JOIST
Connect water supply to preassembled copper
PIPES and check for leaks
FINISHED FLOORING (on wood)
Important: It is the responsibility of the INSTALLER to have
some knowledge of finished floor thickness before proceeding.
Apply top floor SUBSTRATE⓬ around
MUDGUARDS, the two through holes shall be
Ø1-5/16” to 1-1/2” diameter and 7” center to
center
Apply top floor COVERING⓭ (e.g. tile, stone,
etc…) to floor SUBSTRATE
Finished floor COVERING must fall between the
MIN/MAX marks on MUDGAURD for proper
installation of Floor Mounted Tub Filler Faucet
Ø1-5/16 to 1-1/2”
7
HOT
su
pp
l
y
COLD
su
pp
l
y
TUB
location
Use Rigid
Copper Pipe
Ø1-5/16 to 1-1/2”
7