Installation Sheet

9516_ii_140613 Pg 3
5
INSTALLING IN CONCRETE
Determine location of tub & faucet prior to
proceeding
Important: It is the responsibility of the INSTALLER to ensure
that the floor rough is properly secured to all sub-flooring
construction. All local building and plumbing codes and/or ordinances,
shall be followed to confirm proper secure installation.
After determining tub location preparing the floor is
necessary to properly support the rough PLATE
by using 2 x 4 wood cross SUPPORT below the
surrounding CONCRETE⓮topsurface
Important: It is the responsibility of the INSTALLER to have
some knowledge of finished floor thickness before proceeding.
Place MUDGUARDS onto NIPPLES
Use a LEVEL to properly level the PLATE and
SUPPORTS in all directions; vertical height of
PLATE is determined by using the MIN/MAX
finished floor marks on MUDGUARD
Verify that copper PIPES attached to bottom of
NIPPLES clear SUPPORT; adjust in necessary
Using SCREWS secure the PLATE to both
SUPPORTS
Connect water supply to preassembled copper PIPES
and check for leaks
HOT
su
pp
l
y
COLD
su
pp
l
y
TUB
location
Use Rigid
Copper Pipe