Installation Sheet

9516_ii_140613 Pg 4
6
FINISHED FLOORING (on concrete)
Important: It is the responsibility of the INSTALLER to have
some knowledge of finished floor thickness before proceeding.
Pour concrete FILLER (15) around
MUDGUARD encasing PLATE and filling to
surrounding CONCRETE
Apply top floor COVERING (e.g. tile, stone,
etc…) onto concrete FILLER (15) and surrounding
CONRETE
Finished floor COVERING must fall between the
MIN/MAX marks on MUDGAURD for proper
installation of Floor Mounted Tub Filler Faucet
w
ww.californiafaucets.com
5271 Argosy Ave. Huntington Beach, CA 92649 800-822-8855
Ø1-5/16 to 1-1/2”
7
Ø1-5/16 to 1-1/2”
7