User Guide

Table Of Contents
PMP 450 Planning Guide
Figure 26 Grounding and lightning protection on building
Error! No topic specified.
Protection inside a high rise building
The following protection requirements must be observed inside multi-story or high rise buildings (Figure 27):
The drop cable shield must be bonded to the building grounding system at the entry point to the building.
The drop cable shield must be bonded to the building grounding system at the entry point to the
equipment area.
Figure 27 Grounding and lightning protection inside high building
Error! No topic specified.
pmp-0047 (March 2014)
1-115