Manual

STAGE 3
COMMISSIONING THE CONTROL PANEL
3.1 - Initial Wiring & Control Panel Setup
ZA4
1. CONNECT POWER TERMINALS L1 - L2
AND A SUITABLE EARTH (L2 BEING LIVE!)
2. SELECT THE MOTOR POWER SETTING ON
THE TRANSFORMER TO LEVEL 1 FOR
COMMISSIONING
3. INSERT THE START-UPCAPACITORS INTO
THE CONTROL PANEL. THE TWO BLACK
WIRES FOR MOTOR 1 AND THE
TWO RED WIRES FOR MOTOR 2.
4. ENSURE THAT THE MOTORS ARE
ADEQUATELY EARTHED.
13