Adit 3104 User Manual

2-4 Adit 3104 - Release 1.6
Physical Installation
Compliant Installation
NOTE: It is important the DS1/E1 Network Interface Cables are secured separately from the
power and Signal Cables.
1. Inspect the unit.
2. Mount the unit, see Wall Mounting on page 2-5, or Rack Mounting on page 2-6 for detailed
instructions.
3. Ground the unit.
WARNING! THE SEPARATE PROTECTIVE EARTHING TERMINAL PROVIDED ON THIS PRODUCT
SHALL BE PERMANENTLY CONNECTED TO EARTH. SEE GROUNDING THE UNIT ON PAGE 3-3.
4. Connect DS1 (T1), Ethernet and Amphenol connectors as needed.
Note: If Amphenol (25-pin telco) connector is used, a ferrite bead is required to meet
compliance (see graphic above).
5. Connect RS-232 connector and open Terminal Emulator software on your PC. Note: With this
running first, you can monitor the boot process.
6. Connect Power to the unit.
7. Monitor the boot process on your PC, when complete the status light should be green.
8. For any software enabled features, enter the key command. See the key command in the Adit
3000 CLI Reference Manual, for detailed information.
9. To verify use the show version command.
10. Now you can proceed to provisioning the unit. See Chapter 4, Configuration for information.
Ferrite Beads
To be compliant with EMI standards, a ferrite bead is required on the following cable:
Ferrite bead shipped with Adit chassis:
Ferrite Provided Part Number Intended For
1 large P/N 010-0051 25-pair Telco cable (connector on the front of the Adit).