User manual

Adit 600 - Release 10.1.1 7
Quick Start
Compliant Installation
Compliant Installation
1. Connect all of the signal cables as shown in the illustration above, and secure
them with a plastic tie. Dress the signal cables toward the left of the Adit 600.
2. If using the 115V Power Supply, connect the -48 VDC battery power cable.
3. Secure the ground lugs to the terminals using the nuts provided.
4. Secure the power cable and the ground cable with a plastic tie (not included).
Keep these cables separate from the signal cables.
5. Terminate each signal cable to its appropriate connector.
6. Secure signal cables using the holes along the bottom of the rack and plastic
ties (not included).
WARNING! ADDITIONAL PRIMARY PROTECTION IS REQUIRED WHEN CONNECTING
T1/E1
OR FXS INTERFACES TO EXPOSED OFF-PREMISE COMMUNICATION
CONDUCTORS. SECONDARY OVERVOLTAGE AND OVERCURRENT PROTECTION IS
PROVIDED ON THESE INTERFACES FOR LIGHTNING SURGE, AC POWER CONTACT
AND INDUCTION. IT WILL BE THE RESPONSIBILITY OF THE INSTALLER TO UTILIZE
LISTED PRIMARY PROTECTORS AND FOLLOW INSTALLATION REQUIREMENTS PER
LOCAL OR NATIONAL REGULATIONS.
Power Cord
-48 VDC
Battery Power
Alarm Wiring
Signal Cables
Power Cables
Grounding Cable
Ferrite Bead
with cable loop
RS-232 craft port
25-pair telco connector
25-pair telco connector
10Base-T Ethernet
T1/E1 connectors
Ferrite Beads
areinred
US