Installation Guide

A
INSTRUCTION SHEET IS-TFKM5103
STYLE NUMBER:
TFKM5103VB, TFLR5103VB
ISSUED 08-2010 REVISED 2010-08-20
PACKAGE CONTENTS
PART
DESCRIPTION
QUANTITY
B
A Crossbar
1pc
1pc
2pcs
1pc
2pcs
1pc
1pc
1pc
1pc
1pc
Green Ground Screw
Hex Nut
Nipple
Lock Washer
Canopy Chain Loop
Canopy Lock Ring
Fixture Chain
Ceiling Canopy
Socket Assembly
B
C
D
E
F
G
H
1OF6
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
C
D
E
F
G
H
I
J
J
I
WARNING:
CAUTION:
Before beginning the installation, turn off electricity at the circuit breaker box or the main fuse box by switching
off the circuit breaker or removing the fuse.
These instructions are provided for your safety. It is very important that they are read completely before the
installation of your fixture. We strongly recommend that a professional electrician install the fixture.
Disconnect fixture from the power source before replacing the bulb(s), making sure that bulb9s) had sufficient
time to cool down. DO NOT subject the lamp to any shock while lit as shattering of lamp may result.
WARNINGS AND CAUTIONS
Before beginning installation of product, make sure all parts are present. Compare parts with package contents
list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or operate the
product. Contact customer service for replacement part.
Estimated Assembly Time: 30 - 45 minutes
Tool Required for Assembly (not included): Flathead screwdriver, Phillips screwdriver, Pliers, Electrical tape,
Wire cutter, Safety glasses and (3) 100W A19 medium base bulbs
Helpful Tools (not included): Wire strippers.
.
PREPARATION
K
M
L
N
O
P
Q
1pc
1pc
1pc
1pc
3pcs
3pcs
3pcs
Fixture Loop
Center Column
Check Ring
Finial
Socket Collar
Side Chain
Shade
K
L
M
N
O
P
Q

Summary of content (6 pages)