ol tag e D2 Turbo Low-Voltage Pocket installation guide -V Low DOMESTIC SLIDING GATE OPERATOR FOR 250KG GATES
1. Introduction This guide is designed specifically for installers who are familiar with the installation of standard sliding gate motors, but do not know the specifics of the D2 Turbo Low-Voltage. 2. Important safety instructions Please do not proceed with the installation until you have read and fully understand the Safety instructions included in your product packaging. The Safety instructions are also available on www.CentSys.
8 7 6 8 3 2 5 1 4 Legend 1. 10V - 24V AC or 10V - 28V DC supply cable via step-down transformer (mounted in house/dwelling) (2 core cabtyre or twinflex, thickness depending on distance of cable run and transformer output voltage. Refer to Cable Thickness Table in the User Guide Optional wiring (all cable is multi-stranded): 2. Intercom cable from motor to dwelling (n1 + 6 core 0 .5mm2) 3. Intercom cable from motor to entry panel (n2 0.5mm2) 4. Safe CLS: Recommended infrared safety beams (3 core 0.
Mounting studs 8B.2. Fit the mounting studs to the foundation plate and secure in place with the stud locknuts. Stud locknut (M10 half-height nut) Foundation plate Level this end of the rack, and fix 8B.3. Position the foundation plate to allow for the pinion to be unmeshed from the rack when the gearbox has to be removed. Check that the rack is just resting on the pinion Leave clearance under the gearbox to allow for the gearbox to be lowered if the rack and pinion mesh is too tight.
The pinion guard is easily removed and rotated allowing the rack to be fitted above or below the pinion. Holddown nuts (M10 nuts) 8B.5. Use the orange heightadjustment nuts provided to level the gearbox. 8B.6. Tighten the hold-down nuts when the gearbox is in the correct position. Orange heightadjustment nuts Washer Stud locknut (M10 half-height nut) Discus padlock Theft-resistant Nut and Discus padlock are available from Centurion System for sites requiring additional security.
9.1. Always check that the circuit breaker in the electrical panel is in the OFF position, and that all high-voltage circuits (more than 42.4V) are completely isolated from the mains supply before doing any work. 9.2. Ensure that all low-voltage systems (less than 42.4V) are suitably protected from damage, by disconnecting all sources of power such as chargers and batteries before doing any work. 9.3.
PFA: The Pillar Light relay will activate for two seconds before gate movement occurs, as well as during gate movement.
CP106 Relay Card E N i5 Infrared safety beam (opening) Connection type: Normally-closed L Relay card CP106 Rx Tx NO COM NC To alarm panel, etc Step-down transformer capable of supplying the controller with 10V - 24V AC or 10V - 28V DC IRB Receiver 12V- 12V+ COM AUTOC LO SE C Aux 12V Safe Com Com PROF ILE E Safe OPN LIGHT Must be low-voltage globe or separate PSU must be provided! NC NO TES MO RE B DE MO D Step 1: Select FUNCTION Step 2: Select SETTING Step 3: Press Step 4: When finis
Sharecall 0860-CENTURION (0860 236 887) Head Office: +27 11 699 2400 Sharecall Technical Support 0861 003 123 or +27 11 699 2481 from 07h00 to 18h00 (GMT+2) (Sharecall number applicable when dialed from within South Africa only) 0.07.A.0191_22012014 www.CentSys.