User's Manual

41
Drain Connection
Steam and condensate connection
Hot water connection
THE MAIN INCOMING HOT WATER AND STEAM
SUPPLY CONNECTIONS ARE MADE
IN THE LOWER PART OF "D" SECTION
ATTENTION INSTALLERS AND SUPERVISORS
REFER TO THE PLUMBING & ELECTRICAL
CONNECTION DIAGRAM FOR THE LOCATION
AND SIZE OF ALL UTILITIES.
BUILDING VENTILATION CONNECTIONS
ARE MADE AT THE TOP OF THE "A" AND "D"
SECTIONS.
BUILDING VENTS MUST ALIGN WITH THE
DISHWASHER CENTER-LINE AND MATCH THE
SIZE OF THE DISHWASHER VENT DUCTS.
IMPORTANT
Main utility supply connections must
be performed by licenced tradesmen who abide
by local building, health and sanitation codes or
national codes in the absence of local codes.
_________ Installation Instructions
Supply Connections
Supply Connections