Use and Care Manual

9
ENGLISH 100137
ASSEMBLY
Your chipper-shredder requires some assembly. This unit
ships from our factory without oil. It must be properly
serviced with fuel and oil before operation.
If you have any questions regarding the assembly of your
chipper-shredder, call our help line at 1-877-338-0999.
Please have your serial number and model number available.
Unpacking
1. Set the shipping crate on a solid, flat surface
2. Carefully cut the shipping bands and remove lid of
shipping crate.
3. Locate all hardware before beginning assembly.
1) Install the Shredder Chute
1. Align the holes in the upper shredder chute (#53)
with the holes in the lower shredder chute (#52). (A)
2. Insert M6x15 bolt (#43) into the hole of the chutes,
from top to bottom direction. (B)
3. Secure bolt with washer (#21) and lock nut (#22).
4. Tighten till secure. Do not over tighten.
5. Repeat step 2-4 for all holes in the chutes.
2) Install the Handle
1. Insert handle ends (#56) into the receptacles on the
lower shredder chute (#52). (A)
2. Secure handle end by threading bolt M8x35 (#11),
through lock washer (#30) and washer (#14), and
then through the handle. (B)
3. Tighten till secure. Do not over tighten.
4. Repeat step 2-3 until both handle ends are secure.
Make sure chutes are fully secured with all the holes
aligned and filled with bolts. If parts are damaged or
missing do not use the unit until replacement parts
have been obtained.
NOTE
Make sure the rubber blocker (#20) is secure
between the top and bottom chutes. Do not operate
unit if blocker is damaged or missing.
WARNING
53
21
22
43
52
B
56
11
30
14
B
A
Install the Handle Cont’d.
A
3) Install the Chipper Chute
1. Remove bolt used to secure the support bracket to
chute.
Only remove bolt, leave bracket in position
NOTE
18
19
20
23
21
22
62
21
22
63
BA
2. Line up the upper chipper chute (#18) with the
rubber blocker (#20), and with the lower chipper
chute (#23). (A)
3. Once aligned, insert bolt (qty. 4) M6x20 (#19)
through the hole in the upper and lower chipper
chute (Being sure to re-attach support bracket to
chute assembly). Insert bolt from top to bottom
direction. (B)
4. Secure bolt with washer (#21) and lock
nut (#22). (B)
5. Tighten till secure. Do not over tighten.
6. Repeat step 2-4 for all holes in the chutes.