Replacement Part List

9
ENGLISH 100398
ASSEMBLY
Figure 17 - Round Tube Mount Placements: Top View
(Frame Congurations Will Vary)
Center of Frame
FRONT
Hybrid Mount Round Tube Frame Install
1. Place the hybrid lower mount plate up to the frame
at the location behind the front tires where the
frame widens out, as shown in Figure 17. Determine
the location allowing the mount to be centered, back
as far on the frame as possible and the push tubes
to be attached. Keep the mount holes within the
approximate distance from the front of your machine
(see Figure 16).
2. Install the u-bolts to the frame in the locations that
were determined in step one.
If there is a skid plate installed and you do not wish
to remove it, you will need to mark the locations
where the u-bolts will be installed and drill holes.
NOTE
Hybrid Mount Round Tube Frame Install Cont’d.
Figure 18 - Hybrid Mount Round Tube Install
5.2
U-BOLT
FRONT
5.3
1
2
3. Optional: Place the upper mount plate on top of the
lower mount plate as shown in Figure 18. This is not
required but adds strength to the mount for less flex
when plowing.
4. Install the plate assembly to the u-bolts using the
washers (5.3) and
3
8 in. (9.5 mm) nuts (5.2) provided
with the mount.
5. Center the mount on the machine and tighten all
bolts evenly.

Summary of content (3 pages)