Use and Care Manual

100434 - 24 IN. 2-STAGE SNOWBLOWER
MAINTENANCE
25
3. Remove the 2 bolts (20 mm/30 mm) holding the belt guard
(Fig. 24D). Note the spring is loose at this point.
Figure 24D
4. Carefully pivot the snowblower up and forward so that it rests
on the auger housing. Place a piece of cardboard or moving
blanket on the ground before tipping forward. Make sure all
fluids are removed and spark plug is disconnected.
5. Remove the base frame cover (1) from the underside of the
snowblower by removing the six M6 × 16 screws which
secure it (Fig 25).
Figure 25
6. Slide the speed adjusting handle to the right (Fig. 26A) and
remove the loose belt by cutting it or any remaining belt
pieces if the belt has already broken (Fig. 26B).
If cutting the belt be careful of the tensioning pulley and arm
as they are spring loaded and could cause injury when the
belt is cut.
Figure 26A
Figure 26B
7. Slip the new auger drive belt into the compartment from the
bottom of the snowblower placing it around the bottom of the
auger drive pulley and slipping it around the front pulley on
the engine. Ensure the belt is positioned between the bottom
belt guard and the bottom of the auger drive pulley. You may
need to remove the bolt holding the lower belt guard in place
to properly seat the belt into the pulley. Replace the belt
guard and bolt after installing the belt into the pulley
(Fig. 27A/B).
Figure 27A
Figure 27B