Instructions / Assembly

7 REV 66520-20130225
ENGLISH 66520
Your semi-trash pump requires some assembly. This unit
ships from our factory without oil. It must be properly
serviced with fuel and oil before operation.
If you have any questions regarding the assembly of your
semi-trash pump, call our help line at 1-877-338-0999.
Please have your serial number and model number
available.
Remove the Semi-Trash Pump from the Shipping Carton
1. Set the shipping carton on a solid, flat surface.
2. Remove everything from the carton except the
semi-trash pump.
3. Carefully cut each corner of the box from top to bottom.
ASSEMBLY
Install the Wheel Kit
The wheel kit is not intended for over-the-road use.
CAUTION
You will need the following tools to install the wheels:
• 12 mm wrench OR adjustable wrench (not included)
• Socket wrench with a 12 mm socket (not included)
1. Slide the M8x75 wheel bolt through the washer,
sleeve and wheel.
2. Slide the bolt through the mount point on the frame.
3. Fasten securely with the M8 nut.
4. Repeat steps 1-3 to attach the second wheel.
The recommended oil type is 10W-30 automotive
oil.
NOTE
Add Engine Oil
DO NOT attempt to crank or start the engine before
it has been properly filled with the recommended
type and amount of oil. Damage to the
semi-trash pump as a result of failure to follow
these instructions will void your warranty.
CAUTION
Install the Handle
1. Place the handle over the mounting channel on the
frame.
2. Secure the handle to the frame using the two handle
bolts (M8x45).
3. Place a lock nut (M8) on the end of each bolt and
fasten securely. DO NOT over tighten the lock nuts.
Install the Vibration Mounts
1. Attach the rubber vibration mount to the frame
cross member using a cap screw (M8x25) and lock
nut (M8).
2. Thread the cap screw through the vibration mount
and the frame.
3. Secure with lock nut. Tighten, but DO NOT over
tighten.
4. Repeat steps 1-3 for second mount.