Installation Guide

102006 - AUTOMATIC TRANSFER SWITCH WITH aXis CONTROLLER™ MODULE
INSTALLATION
12
4. On the Champion aXis Controller
TM
Home Standby Generator
Settings Page, set the date and time. Use either the drop-
down boxes or the “USE THIS DEVICE’S DATE & TIME” button
to set the time and date. Confirm and Save the settings
before continuing.
5. Set the HSB exercise frequency and schedule. Confirm and
Save the settings before continuing.
6. Wireless network settings are not used at this time. The
default values (shown below) should not be adjusted.
7. The time, date, and exercise information have now been
setup for the aXis ATS and HSB. You can close your browser
and disconnect from the WIFI, or skip to step 2 in the next
section “ATS & HSB STATUS USING WIFI”.
ATS and HSB Status Using WIFI
1. Using a WIFI enabled device, connect to the “Champion HSB”
WIFI network following steps 1, 2, and 3 from WIFI Setup
Method.
2. After loading the Home Standby Generator Settings page,
locate and click the icon at the bottom right corner of the
page.
3. You are now viewing the ATS and HSB status page. Items
such as voltage, frequency, current, etc. can all be viewed
for both utility and HSB power. All of the information is
live. There are three tabs located at the top of the page.
ATS, GEN, and LMM. Each tab will display
the status for the Transfer Switch, Home Standby Generator,
or Load Management Module(s) respectively.
4. When finished viewing the status of the ATS, Generator, and
LMM, close your browser and disconnect from the WIFI.
Connecting the Load Management Systems
The following instructions pertain only to aXis Controller
TM
Load
Management Modules (LMM) that use Power Line Carrier (PLC)
communication. If one or more LMMs are being installed on the
home, install them per the installation instructions included with
the LMM before continuing.
Teaching System
After installation and wiring are complete teach the ATS which
loads are attached by the following procedure. Teaching the
system is only required if 1 or more LMM’s were installed OR if
AC1 OR if AC2 is being used to manage loads.
1. Turn Champion aXis Controller
TM
ATS UTILITY circuit
breaker to the OFF position. Generator will start and run
automatically.
2. Confirm managed loads are all operating.
3. Press and hold the button marked “LEARN” for 8 seconds.
ATS will shutoff managed loads one at a time until all are OFF.
ATS will flash LED’s indicating function in process.
4. After ATS has learned all loads the LMM units will be returned
to normal operation.
5. Installation configuration is now held in memory and will not
be affected by power outage.