The Essential layout

19
For technical assistance, contact a local building expert. Consult local authorities to ensure compliance with local codes and regulations.
Once assembled, lay out and construct the plywood countertop.
If tiling, we suggest two layers of ¾” thick treated plywood, topped with ½” thick cement board.
NO OVERHANG
1 1/2”
overhang
on outer
perimeter