How to Guide
113
FlowGuard Gold
®
Pressure Rating Chart (psi)
Pipe
Size 73°F 80°F 120°F 140°F 180°F
ALL 400 328 260 200 100
(SDR-11)
Corzan
®
Schedule 80 Pressure Rating Chart (psi)
Pipe
Size 73
°
F 80
°
F 120
°
F 140
°
F 180
°
F
w
w
w
w
w
SPECIAL CONSIDERATIONS
Do not exceed the maximum working pressure of any
system components including pipe, fittings, valves, molded
or cut threads, unions, mechanical coupling or flanges.
J^[fh[iikh[hWj_d]e\WbbYecfed[djickijX[h[ZkY[ZWj
j[cf[hWjkh[iWXel[-)Z[]h[[i<$H[\[hjeZ[#hWj_d]jWXb[
_dj^_icWdkWb$
;nY[[Z_d] j^[ cWn_ckc meha_d] j[cf[hWjkh[ eh
fh[iikh[e\j^[ioij[ccWoh[ikbj_d ioij[c\W_bkh[WdZ
fhef[hjoZWcW][$
Use of FlowGuard Gold
®
CTS CPVC all-plastic threaded
male adapters in hot water applications may result in
system failure and property damage.
Ki[ fbWij_Y j^h[WZ[Z 9JI 9FL9 cWb[ WZWfj[hi _d YebZ
mWj[hWffb_YWj_ediedbo$
Ki[9JI9FL9nXhWiij^h[WZ[ZjhWdi_j_ed\_jj_d]i\eh^ej
mWj[hWffb_YWj_edi$
:e dej ki[ Yecfh[ii_ed \_jj_d]i m_j^ XhWii \[hhkb[i je
Yedd[Yjje9JI9FL9f_f[eh\_jj_d]im^[h[mWj[h
j[cf[hWjkh[im_bb[nY[[Z'*&Z[]h[[i<$
9FL9f_f[YWdX[ki[Zm_j^ijWdZWhZXhWii\[hhkb[ije
cWa[ Yecfh[ii_ed Yedd[Yj_edi m^[h[ j^[ ef[hWj_d]
j[cf[hWjkh[m_bbdej[nY[[Z'*&<$7ffboJ[\bedFJ<;
jWf[el[hj^[\[hhkb[jeWbbem\ehj^[Z_ii_c_bWhj^[hcWb
[nfWdi_ed WdZ YedjhWYj_ed Y^WhWYj[h_ij_Yi e\ j^[ c[jWb
\[hhkb[WdZj^[fbWij_Yf_f[$
Failure to compensate for expansion and contraction
caused by temperature change may result in system
failure and property damage.
:e dej h[ijh_Yj [nfWdi_ed eh YedjhWYj_ed$ H[ijhW_d_d]
cel[c[dj _df_f_d] ioij[ci_idejh[Yecc[dZ[ZWdZ
cWoh[ikbj_d`e_djeh\_jj_d]\W_bkh[$
Ki[ ijhWfi eh YbWcfi j^Wj Wbbem \eh f_f_d] ioij[c
cel[c[dj$
7b_]d Wbb f_f_d] ioij[c Yecfed[dji fhef[hbo m_j^ekj
ijhW_d$:edejX[dZehfkbbf_f[_djefei_j_edW\j[hX[_d]
iebl[djm[bZ[Z$
:edejj[hc_dWj[Wf_f[hkdW]W_dijWijWj_edWhoeX`[Yj
[nWcfb[0mWbbeh\beeh`e_ij$
:edej_dijWbb\_jj_d]ikdZ[hijh[ii$
Prior to installing PVC or CPVC piping in hydronic
applications, it is important to flush the interior of the heat
exchangers and the exterior of the condenser coils
thoroughly with a mild ionic detergent solution to remove
incompatible oils. Failing to do so could result in system
failure and property damage.
Verify that all boiler cleaning and sealing chemicals used in
hydronic radiant heating systems are compatible with PVC
or CPVC. Failure to do so could result in system failure and
property damage.
Equipment leaks in refrigeration or HVAC systems may
release POE oils or other contaminants into the piping
system. These oils and contaminants are incompatible with
PVC or CPVC and such exposure may result in pipe or
fitting failure regardless of flushing.
and cold mixing devices.
t %P OPU BQQMZ FYDFTTJWF TPMWFOUDFNFOU UP UIF KPJOUT
Puddling of solvent cement must be avoided.
t %P OPU SFMZ PO BO FYQBOTJPO UBOL UP IBOEMF UIFSNBM
expansion of the piping system. Expansion tanks
accommodate expansion of the fluid, not longitudinal
expansion of the pipe. The piping system must be designed
to allow for thermal expansion.