How to Guide
92
Plastics Technical Manual
INSTALLATION PROCEDURES
• Apply a full even
layer of cement to
the pipe surface
to a point ½”
beyond the hub
depth. Aggres-
sively work the
cement into the
surface.
• Oncethesurfaceisprimedremoveallpuddlesofexcess
primer from the fitting socket.
• TheuseofprimerforABSisnotrecommended.Check
local code requirements.
9. Coat Surface with Cement
• Cementmustbeappliedwhileprimeriswet.Itisideal
if one mechanic applies the primer while a second im-
mediately applies the cement.
• Stirorshakethecementpriortouse.
9
• Apply a medium
layer of cement to
the fitting sock-
et aggressively
working it into
the surface. On
bell end pipe do
not coat beyond
the socket depth.
• NOTICE: CPVC Schedule 80 systems must be installed
usingIPS714orOateyCPVCHeavyDutyOrangesol-
vent cements.
10. Join Pipe and Fittings
• Assemblepipeandttingsquicklywhilecementisu-
id. If cement has hardened, cut pipe, dispose of fitting
• Apply a second
full coat of ce-
ment to the pipe
surface aggres-
sively working it
in.
• Do not allow ce-
ment to puddle or
accumulate inside
the system.
• Solvent cement
10
and start over.
• Itisveryimpor-
tant that the pipe
is fully inserted
to the fitting stop
at the bottom of
the fitting. Large
diameter pipe is
heavy and can
develop signifi-
cant resistance
during insertion.
The use of a pull-
ing tool designed for plastic piping systems is recom-
mended.
shouldconform totheappropriateASTMstandard for
the piping system as shown in the accompanying table.
Heavybodied cement isrecommended.Allpurposece-
ment is not recommended
Primers and cements are extremely flammable and may be
explosive. Do not store or use near open flame or elevated
temperatures, which may result in injury or death.
• Solvent fumes created during the joining process are
heavier than air and may be trapped in newly installed
piping systems.
• Ignition of the solvent vapors caused by spark or flame
may result in injury or death from explosion or fire.
• Read and obey all manufacturers' warnings and any
instructions pertaining to primers and cements.
• Provide adequate ventilation to reduce fire hazard and
to minimize inhalation of solvent vapors when working
with cements, primers and new piping systems.
•
NOTICE: Pipediameters6”andlargermustbeinstalled
using IPS P-70 or Oatey Industrial Grade primers.
• Apply a second
coat of primer to
the fitting sock-
et aggressively
working it into
the surface.
• More applica-
tions of primer
may be required
on hard surfaces
or cold weather
conditions.