Use And Care Manual

8
CBO-750 Hybrid Assembly Instructions
Hearth Insulation
Sub-hearth Insulation Boards (supplied)
Shown is the final assembly of the five-piece CBO-750 Oven. The final
assembly will rest on the Galvannealed Steel Plate and Insulation Boards
on your Support Base.
Oven Assembly
Your CBO-750 Hybrid Oven comes Pre-Assembled with Insulation Boards
that are placed under both pieces of the Hearth—on top of the Steel
Plate—for insulation.
Place the Hybrid Unit on the Support Base.
The Oven's decorative finish should be built on top of the Support Base,
not on top of the Insulation Boards. Remember, the Insulation Boards
should not be exposed to the elements and should not get wet.
Note: It is important that you use all of the insulation supplied to avoid a
possible fire. The sub-hearth insulation should not be exposed to the
elements and should never get wet. It is recommended that you sweep or
vacuum the Galvannealed surface to remove debris before Hearth
installation.
Hearth
(3 pieces)
Arch
Dome
Support
Base