3. Connect the cable from the TPC to the connector on the rear panel of the cinema projector.
4. Adjust the angle of the TPC.
2.7 Connect Optional Exhaust Ducting
Connect the existing outside-venting
ductwork to the 8 inch diameter exhaust port
on the top of the cinema projector. Confirm
that there are no obstructions or bends in the
ducting, and all air intakes are free of
obstructions.
The pre-installed outside-venting duct
should be rigid at the cinema projector and
must also include a heat extractor and blower
that maintains a minimum of 450 CFM*
when the cinema projector is operating at
less than or equal to 25°C ambient and less
than 3,000 feet, while measured at the
cinema projector exhaust opening.
*600 CFM is required in projection rooms with an ambient temperature above 25°C or
located at an elevation greater than 3000 feet above sea level.
At minimum, a 10” long, strong metal duct must be installed at the cinema projector to pre-
vent glass shards from exiting the duct in the event of a lamp explosion.
2.7.1 Determine the cinema projector Exhaust CFM Value
Use an airflow meter to measure the ft/min or ft/sec at the rigid end of the open exhaust duct that connects to
the cinema projector. Take the measurement at the very end of the duct without the cinema projector
connected. Use this formula to determine the CFM value for the cinema projector:
Measured linear ft/min x 0.34 = CFM