User`s guide

144 Adept Cobra PLC600/PLC800 Robot User’s Guide, Rev C
12. Locate the spare air line contained in the tubing bundle inside the front end of the
cover. Remove the spare air line from the bundle.
13. Insert the spare air line into the back of the empty 6mm User Air fitting.
NOTE: This 6mm User Air connector and the 6mm User Air connector at
the top of Figure 7-2 on page 139 are not functional for other uses after
this modification.
14. Replace the Joint 1 cover, taking care to insure that all tubing is inside the cover
and nothing gets crimped or pinched while pushing the cover into position.
Replace four screws to secure the cover. Tighten the screws to 1.6 N•m (14 in-lb)
of torque.
15. Replace the outer link cover and tighten the screws to 1.6 N•m (14 in-lb) of
torque.
16. Connect the factory air supply to the modified 6mm User Air connector.
17. Turn on system power and boot the system. Once the system boot has completed,
you can toggle the outputs from the PLC. Refer to Chapter 6 for register
information.
7.6 DeviceNet Pass-Through Cable
DeviceNet is a communications link that connects industrial I/O devices to a message
packeting network. All devices connect to the same backbone cable, eliminating the need
for individual wiring for each I/O point.
NOTE: The DeviceNet cable in the robot is strictly for pass-through. If
DeviceNet is used, it must be implemented from the user-supplied PLC.
The PLC Server does not support DeviceNet.
Adept incorporates the following DeviceNet ready hardware in the Adept Cobra PLC
robot:
Female connector for the robot tower; Micro-style 12 mm thread DIN female
connector (see Figure 7-7 on page 145)
Male Micro-style 12 mm thread DIN connector at the robot base.
WARNING: Disconnect robot air pressure until this test
has been done to prevent unsecured pneumatic lines from
accidentally injuring personnel.