User`s guide

58 Adept Cobra PLC600/PLC800 Robot User’s Guide, Rev C
Figure 4-6. Single-Phase AC Power Installation from a Three-Phase AC Supply
Details for AC Mating Connector
The AC mating connector is supplied with each system. It is typically shipped in the
cable/accessories box. The supplied plug is internally labeled for the AC power
connections (L, E, N).
Procedure for Creating 200-240 VAC Cable
1. Locate the AC mating connector shown in Table 4-9.
2. Open the connector by unscrewing the screw on the shell and removing the cover.
3. Loosen the two screws on the cable clamp. See Figure 4-7 on page 59.
4. Use 18 AWG wire to create the AC power cable. Select the wire length to safely
reach from the user-supplied AC power source to the robot base.
5. Strip approximately 18 to 24 mm insulation from each of the three wires.
6. Insert the wires into the connector through the removable bushing.
7. Connect each wire to the correct terminal screw, and tighten the screw firmly.
Table 4-9. AC Mating Connector Details
AC Connector details AC in-line power plug,
straight, female, screw
terminal, 10 A, 250 VAC
Qualtek P/N 709-00/00
Digi-Key P/N Q217-ND
E
E
N
L3
L
L1
L2
F5 10A
F4 10A
Adept CobraPLC
600/800 Robots
1Ø 200–240VAC
User-Supplied
AC Power Cable
Note: F4 and F5 are user-supplied, must be slow blow.
200–240VAC
L = Line 1
N = Line 2
E = Earth Ground
200–240VAC