Installation Guide

12
Downrod Mounting (continued)
3
Mounting the power supply box
Attach the rigid pipe (not included) to the ceiling and pull
the wiring from the electrical box through the pipe.
Place the pipe through the center knock-out hole in the
power supply box and secure it with the appropriately
sized hardware (not included).
BB
Power Supply
Box
Rigid Pipe
4
Attaching the fixture body to the power supply box
Attach the open hooks on the ends of the cable sets (BB) to the hanging holes on the fixture body (A).
Close the hook openings with pliers.
Connect the two ends of the Quick Connect wires.
Quick
Connect
BB
A
Power
Supply Box