Installation Guide
12
Downrod Mounting (continued)
3
Mounting the power supply box
□ Attach the rigid pipe (not included) to the ceiling and pull
the wiring from the electrical box through the pipe.
□ Place the pipe through the center knock-out hole in the
power supply box and secure it with the appropriately
sized hardware (not included).
BB
Power Supply
Box
Rigid Pipe
4
Attaching the fixture body to the power supply box
□ Attach the open hooks on the ends of the cable sets (BB) to the hanging holes on the fixture body (A).
□ Close the hook openings with pliers.
□ Connect the two ends of the Quick Connect wires.
Quick
Connect
BB
A
Power
Supply Box