Instructions / Assembly
10
B
3
Attaching the light to the chain
□ Attach the S hook at the bottom of the mounting
chain (not included) to the fixture body (B). Repeat
this step on the other side of the fixture.
4
Attaching the chain to the ceiling
□ Hang the fixture body (B) by placing one chain over each
hook (not included) that has been installed on the ceiling.
□ Adjust chains to level light.
NOTE: If using eye hooks in the ceiling instead, attach the top
of the chain with S hooks.
NOTE: Product should be suspended using metal chain or
cable and hooks with weight bearing capacity exceeding 11 lbs
(5 KG). S hooks must be ≤ 0.1 in. (2.5 mm) to fit the holes in the
fixture body (B).
B
Suspension Mounting (continued)